Geotechnical Pavement Engineering Report for East Bonita Avenue Pavement Rehabilitation (2023)
The project involved the pavement rehabilitation of Bonita Avenue between San Dimas Avenue and the eastern City limits approximately 600 feet east of San Dimas Canyon Road in San Dimas, California. The segment of Bonita Avenue within the project limits is approximately 4,700 feet in length and mainly includes two traffic lanes and turn pockets in each direction. GAI performed a geotechnical pavement investigation for the project.
LOCATION: San Dimas, CA
AGENCY/CLIENT: City of San Dimas