Geotechnical Investigation and Field Observation and Testing for Avenida Entrada et al Street Improvement Project (2019)
The project rehabilitated the residential areas of Avenida Entrada between Paseo Corrido and Calle Linda and involved full-depth removal and reconstruction of the entire asphalt concrete and base layer, reworking of the subgrade soils, and placing back well-compacted layers of base and asphalt concrete. Asphalt Rubber Hot Mix (ARHM) was used for the circular part of the cul-de-sacs.
GAI provided a geotechnical/pavement engineering investigation and performed all geotechnical-related field observation and testing during construction of the project.
LOCATION: San Dimas, CA
AGENCY/CLIENT: City of San Dimas