Geotechnical Investigation for Pavement Failure at 4910 Hampstead Road (2022)
Hampstead Road is a two-way hillside street with ascending and descending slopes. Within the vicinity of 4190 Hampstead Road, the pavement had significant cracking with definite signs of settlement and/or lateral movement. The purpose of the project was to evaluate the stability of the cut-fill slope, repair and stabilize the slope. GAI provided a geotechnical investigation for the project and prepared a geotechnical report for the remedial and stabilizing works.
LOCATION: La Canada Flintridge, CA
AGENCY/CLIENT: City of La Canada Flintridge