Geotechnical Investigation, and Soils and Materials Inspection and Testing Services for the District Office Renovation and Expansion Project (2018-2019)
The project consisted of the renovation of the district building and the construction of additions to the building. The work included the demolition and replacement of flooring, walls, asphalt, and concrete for the construction of the additions and replacement of the parking area north of the building, as well as the excavation and construction of the new footings, concrete sidewalks, and utility trenches.
GAI’s scope of work included geotechnical investigation and during construction soils and materials inspection and testing services in the field and laboratory, and specialty inspection services.
ADDITIONAL PROJECTS FOR THIS SCHOOL DISTRICT INCLUDE:
- Bonita High School Athletic Field Project (Soils and Materials Testing and Inspection Services)
- Shade Structure at Oak Mesa Elementary School (Geotechnical Investigation)
- Gymnasium HVAC Replacement for San Dimas High School (Soils and Materials Testing and Inspection Services)
- Gymnasium HVAC Replacement for Bonita High School (Soils and Materials Testing and Inspection Services)
- San Dimas High School Culinary Arts Modernization (Soils and Materials Testing and Inspection Services)
- New Construction at Allen Avenue Elementary School (Soils and Materials Testing and Inspection Services)
- In-Plant Welding Inspection for San Dimas High School Shade Structure (Soils and Materials Testing and Inspection Services)
- San Dimas High School Modular Toilet (Geotechnical Investigation and Geohazard Evaluation)
- Lone Hill and Ramona Middle Schools’ New Gymnasiums, New Construction (Soils and Materials Testing and Inspection Services)